Contact Us:
+234 813 7701 720
mindandbrainpower@gmail.com
Home
Project Topics
Hire A Writer
How it works
Download Project
Payment details
Easy Project Material
Home
Project Topics
Hire A Writer
How it works
Download Project
Payment details
Chemical Engineering
Home
Chemical Engineering
Showing 1–50 of 201 results
Default sorting
Sort by popularity
Sort by latest
Sort by price: low to high
Sort by price: high to low
A COMPARATIVE STUDY OF CHEMICAL AND MICROWAVE SYNTHESIZED ACTIVATED CARBON FROM CORN COB
₦
5,000
A COMPARATIVE STUDY OF CHEMICAL AND MICROWAVE SYNTHESIZED ACTIVATED CARBORN FROM CORN COB
₦
5,000
A PROJECT REPORT ON CONSTRUCTION OF INDUSTRIAL SIEVE COMPARTMENT
₦
5,000
ADSORPTION OF PALM OIL WITH SYNTHETIC ADSORBENT (COAL)
₦
5,000
AIR INJECTION STUDIES FOR ENHANCED OIL RECOVERY
₦
5,000
ALTERNATIVE RAW MATERIAL SOURCES FOR CEMENT PRODUCTION
₦
5,000
AN EMISSION INVENTORY OF POLLUTANT
₦
5,000
AN EMISSION INVENTORY OF POLLUTANTS
₦
5,000
ANALYSIS OF BUSH PEAR AND IT’S OIL
₦
5,000
ANALYSIS OF BUSH PEAR AND IT’S OIL
₦
5,000
ANALYSIS OF BUSH PEAR AND IT’S OIL
₦
5,000
ANALYSIS OF ENUGU COAL
₦
5,000
ASSESSMENT OF CARBON MONOXIDE (CO) LEVEL IN METROPOLIS MONITORING INDUSTRIAL AND RESIDENTIAL AREA
₦
5,000
BIO-MONITORING OF THE TOXICITY OF SOME HEAVY METALS IN OCCUPATIONALLY EXPOSED WORKERS IN NIGERIA
₦
5,000
BLEACHING OF PALM OIL USING ACTIVATED CHARCOAL
₦
5,000
CARDIO PROTECTIVE ACTIVITIES OF N-HEXANE EXTRACT OF DESMODIUM VELUTINUM STEM ON ALBINO WISTAR RAT
₦
5,000
CHARACTERIZATION OF SOME BRANDED MOTOR OIL
₦
5,000
COMPARATIVE ANALYSIS OF COAL AND COCONUT ACTIVATED CARBON
₦
5,000
COMPARATIVE ANALYSIS OF COAL, FUEL OIL AND NATURAL GAS FOR CEMENT PRODUCTION
₦
5,000
COMPARATIVE ANALYSIS OF COAL, FUEL OIL AND NATURAL GAS FOR CEMENT PRODUCTION
₦
5,000
CONSTRUCTION OF 2,000 LITRES CAPACITY WATER RE-SERVOIR
₦
5,000
CONSTRUCTION OF 500 GALLONS (2250 LITRES) WATER RESERVOIR
₦
5,000
CONSTRUCTION OF A “CHEMICAL RACK”
₦
5,000
CONSTRUCTION OF A BLENDER
₦
5,000
CONSTRUCTION OF A CHEMICAL RACK, STUDY APPARATUS
₦
5,000
CONSTRUCTION OF A DISTILLATION COLUMN WITH REFLEX DIVIDER AND CONDENSER
₦
5,000
CONSTRUCTION OF A FLUIDIZED BED REACTOR
₦
5,000
CONSTRUCTION OF A JUICE EXTRACTOR MACHINE
₦
5,000
CONSTRUCTION OF A METAL RACK
₦
5,000
CONSTRUCTION OF A MODEL SHELL AND TUBE HEAT EXCHANGER
₦
5,000
CONSTRUCTION OF A PILOT MOTORISED MIXER
₦
5,000
CONSTRUCTION OF A SIMPLE SIZE REDUCTION MACHINE
₦
5,000
CONSTRUCTION OF A STANDARD DRAWING DESK
₦
5,000
CONSTRUCTION OF A STANDARD WHEEL BARROW
₦
5,000
CONSTRUCTION OF A STEEL CUPBOARD
₦
5,000
CONSTRUCTION OF A VERTICAL FIRE TUBE BOILER
₦
5,000
CONSTRUCTION OF A WOODEN BOOK SHELF
₦
5,000
CONSTRUCTION OF AIR CONDITIONING UNIT
₦
5,000
CONSTRUCTION OF ALUMINUM WALL RACK
₦
5,000
CONSTRUCTION OF ALUMINUM WALL RACK
₦
5,000
CONSTRUCTION OF AN INDUSTRIAL BARROW
₦
5,000
CONSTRUCTION OF BOOK SHELVE
₦
5,000
CONSTRUCTION OF CELLOPHANE SEALING MACHINE
₦
5,000
CONSTRUCTION OF FLOW NOZZLE
₦
5,000
CONSTRUCTION OF HEAT EXCHANGER FABRICATION OF A TUBE AND SHELL HEAT EXCHANGER SYSTEM
₦
5,000
CONSTRUCTION OF HYDRO CYCLONE
₦
5,000
CONSTRUCTION OF INDUSTRIAL BARROW
₦
5,000
CONSTRUCTION OF INDUSTRIAL MIXER
₦
5,000
CONSTRUCTION OF INDUSTRIAL SIEVE COMPARTMENT
₦
5,000
CONSTRUCTION OF INDUSTRIAL WHEEL BARROW
₦
5,000
1
2
3
4
5
→