Show all

CONSTRUCTION OF A VERTICAL FIRE TUBE BOILER

5,000

ATTENTION:

BEFORE YOU READ THE CHAPTER ONE/ABSTRACT OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

 

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY.

THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08137701720

 

 

CONSTRUCTION OF A VERTICAL FIRE TUBE BOILER

 

ABSTRACT

 

The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu.

 

The boiler contains 2 steam  tubes at triangular pitch which are enclosed in a shell.  Water is introduced through the shell.  When the burner is put on, the products of combustion – excess oxygen, nitrogen and carbondioxide pass through the tubes at a high temperature and then heats the surrounding water, as a result, steam is generated.

 

It has a capacity of 20,000cm3 of water and can produce 0.05kg of steam per hour.  It can be used widely for the generation of stem for laboratory uses and by small scale industries.

 

The materials used were mainly mild steel.  About 10 electrodes were used for the welding and care was taken to ensure strong welding, although it is a low pressure boiler. The top sheet plato is 0.0125cm thick.  The tube bundles are galvanized tubes.  Details of the engineering and working drawings are shown.  The construction of this boiler did not follow any code.

 

TABLE OF CONTENTS

 

CHAPTER ONE

 

Introduction

 

CHAPTER TWO

 

Literature Survey

 

CHAPTER THREE

 

Material Selection

 

CHAPTER FOUR

 

Constructional Methods

 

CHAPTER FIVE

 

Discussion

 

Conclusion

 

References

 

Bibliography

 

CHAPTER ONE

 

INTRODUCTION

 

The term “boiler” applies to a device for generating: Steam for power, processing or heating purposes; Hot water for heating purposes or hot water supply. Boilers are designed to transmit heat from an external combustion source (usually full combustion) to a fluid contained within the boiler itself.

 

Boilers can be broadly grouped into lower pressure type and high pressure boiler.  The constructed vertical fire tube boiler is a low pressure boiler. The boiler is constructed so as to generate steam for chemical engineering processes, heating drying, sterilizing, etc.

 

Holes at triangular pitch were drilled at the bottom and top sheet plates of the boiler.  Steam tubes were passed through these holes and then welded strongly.  Other holes were drilled only on the top plate, so that steam will pass through them.  This was pushed in to a shell and welded together.  A mild steel plate was used to prevent the products of combustion passing from the steam tubes to come into contact with the generated steam.  A stack was provided for the flue gases to escape.

 

HOW TO GET THE FULL PROJECT WORK

 

PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).

 

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to 08137701720

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

 

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

 

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 2023350498

Bank: UBA.

 

 

NOTE:

YOU CAN ALSO MAKE A TRANSFER PAYMENT

 

FOR MORE INFORMATION, CALL:

08137701720

 

AFFILIATE LINKS:

www.easyprojectmaterials.com

www.easyprojectmaterials.net.ng

www.easyprojectsmaterials.net.ng

www.easyprojectsmaterial.net.ng

www.easyprojectmaterial.net.ng

www.academia.edu