Show all

DETERMINATION OF ALKALINITY OF SACHET AND BOREHOLE WATER

5,000

ATTENTION:

BEFORE YOU READ THE CHAPTER ONE/ABSTRACT OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

 

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY.

THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08137701720

 

 

DETERMINATION OF ALKALINITY OF SACHET AND BOREHOLE WATER

 

ABSTRACT

 

Studies have shown that alkaline water helps neutralize acids in the body and allows for the free passage of substrate. The alkalinity of selected sachet and borehole water in Remo land were determined and the water samples were subsequently alkalised with the use of energy cup.

 

The untreated SW4 sachet water has the highest pH meter value of (7.2) and a pH colour chat value of (8.0) while the treated SW3 had a pH meter value of (9.9) and a pH colour chart value of (9.5) respectively.   The untreated borehole water samples of BW2 has the highest pH meter value of (6.0) and pH colour chat value of (6.0) while the treated BW1 and BW2 has the highest pH value of (9.2) each and pH colour chat value of (8.0) respectively.  The experiment however highlighted the high acidic content of SW2 for sachet water, with pH of (5.2) and BW2 for borehole water, with pH of (4.8), asserting the high acidic contents. Drinking such water could pose dangerous health risks to consumers of the water.

 

There is a need for the intervention of appropriate regulatory agencies to ensure production of high quality sachet waters which have the WHO standard pH of 6.5 to 8.5, although the normal pH of pure water should be 7.

 

TABLE OF CONTENTS

 

CHAPTER ONE

 

1.0     Introduction

 

1.1     Aim of research

 

1.2     Justification of research

 

CHAPTER TWO

 

2.0     Literature review

 

2.1     Health effects of water consumption

 

2.2     Sachet Water

 

2.3     Borehole Water

 

2.4     Alkaline Water

 

2.5     Energy Cup

 

CHAPTER THREE

 

3.0     Materials and Methods

 

3.1     Materials Used

 

3.2     Procedure

 

CHAPTER FOUR

 

4.0     Results

 

CHAPTER FIVE

 

5.0     Discussion, Conclusion and Recommendation

 

5.1     Discussion

 

5.2     Conclusion

 

5.3     Recommendation

 

References.

 

HOW TO GET THE FULL PROJECT WORK

 

PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).

 

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to 08137701720

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

 

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

 

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 2023350498

Bank: UBA.

 

 

NOTE:

YOU CAN ALSO MAKE A TRANSFER PAYMENT

 

FOR MORE INFORMATION, CALL:

08137701720

 

AFFILIATE LINKS:

www.easyprojectmaterials.com

www.easyprojectmaterials.net.ng

www.easyprojectsmaterials.net.ng

www.easyprojectsmaterial.net.ng

www.easyprojectmaterial.net.ng

www.academia.edu