Show all

IMPROVED/ENHANCED OIL RECOVERY

10,000

ATTENTION:

BEFORE YOU READ THE CHAPTER ONE/ABSTRACT OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

 

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N10,000 ONLY.

THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08137701720

 

 

IMPROVED/ENHANCED OIL RECOVERY

 

Abstract

This work discusses improved/enhanced oil recovery.This project presents a comprehensive review of the technical progress as well as updated knowledge and understandings of IOR/EOR technologies for tight oil reservoirs. Critical and in-depth assessment of various IOR/EOR methods is made upon the best practice and lessons learned, mainly, in the North America. In the past few years, many traditional and new IOR/EOR methods have been tested in laboratory and piloted in field to investigate their potential in improving oil recovery from unconventional plays, including water injection, miscible and immiscible gas injection, water-alternating-gas injection, chemical flooding, and nanotechnology. Feasibility concerns and technical challenges, such as low injectivity, formation damage, and low sweep efficiency arising from extremely low permeability and high heterogeneity in fractured tight oil reservoirs, are raised for directly adopting traditional IOR/EOR methods. IOR/EOR mechanisms in tight oil reservoirs mainly involve gas and oil flows in nanometer pores, gas dissolution and diffusion through low permeability matrix, oil swelling, wettability alteration, IFT reduction, and fracture-matrix interaction, thus thorough understanding of flow and transport mechanisms in multi-scale pores and fractures is indispensable for developing effective IOR/EOR technologies. To optimize the selection of specific gas species or chemical formulas, it is necessary to conduct preliminary assessment of practicability and viability with both experimental studies and numerical simulations for operation upscaling and production prediction before field implementation.

HOW TO GET THE FULL PROJECT WORK

 

PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).

 

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#10,000) into our bank Account below, send the following information to 08137701720

(1)    Your project topic

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

 

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

 

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 2023350498

Bank: UBA.

 

 

NOTE:

YOU CAN ALSO MAKE A TRANSFER PAYMENT

 

FOR MORE INFORMATION, CALL:

08137701720

 

AFFILIATE LINKS:

www.easyprojectmaterials.com

www.easyprojectmaterials.net.ng

www.easyprojectsmaterials.net.ng

www.easyprojectsmaterial.net.ng

www.easyprojectmaterial.net.ng

www.easyprojectmaterials.com.ng