ATTENTION:
BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!
INFORMATION:
YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420
THE MANAGEMENT OF NIGER DELTA CRISIS
ABSTRACT
This work discusses the management of Niger delta crisis. A hundred and twenty questionnaires were distributed among people from selected Niger delta states, Rivers state, Delta state and Bayelsa state. Interviews and surveys were also conducted.
Primary and secondary data were used in the analysis. Tables and percentages were used as the instrument of analysis
It was observed therefore that the management of the Niger delta crisis has a significant positive impact in the peace and development of the Niger delta region. Also, there is strong relationship between the management of Niger delta crisis and the development of the Niger delta region.
TABLE OF CONTENT:
CHAPTER ONE
INTRODUCTION
1.1 Background of the Study
1.2 Statement of the Research Problem
1.3 Objectives of the Study
1.4 Significance of the Study
1.5 Research Questions
1.6 Research Hypothesis
1.7 Conceptual and Operational Definition
1.8 Assumptions
1.9 Limitations of the Study
CHAPTER TWO
LITERATURE REVIEW
2.1 Sources of Literature
2.2 The Review
2.3 Summary of Literature Review
CHAPTER THREE
RESEARCH METHODOLOGY
3.1 Research Method
3.2 Research Design
3.3 Research Sample
3.4 Measuring Instrument
3.5 Data Collection
3.6 Data Analysis
3.7 Expected Result
CHAPTER FOUR
DATA ANALYSIS AND RESULTS
4.1 Data Analysis
4.2 Results
4.3 Discussion
CHAPTER FIVE
SUMMARY AND RECOMMENDATIONS
5.1 Summary
5.2 Recommendations for Further Study
Bibliography
HOW TO GET THE FULL PROJECT WORK
PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).
HOW TO RECEIVE PROJECT MATERIAL(S)
After paying the appropriate amount (#5,000) into our bank Account below, send the following information to
08068231953 or 08168759420
(1) Your project topics
(2) Email Address
(3) Payment Name
(4) Teller Number
We will send your material(s) after we receive bank alert
BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.
OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 3139283609
Bank: FIRST BANK
FOR MORE INFORMATION, CALL:
08068231953 or 08168759420
https://projectmaterialsng.blogspot.com.ng/
https://foreasyprojectmaterials.blogspot.com.ng/
https://mypostumes.blogspot.com.ng/
https://myeasymaterials.blogspot.com.ng/
https://eazyprojectsmaterial.blogspot.com.ng/
https://easzprojectmaterial.blogspot.com.ng/